WITH OUR WELL EXPERENCED STAFF AND TECHNICAL EXPERTISE, WE CAN ALWAYS COMPLETE OUR PROJECTS ON TIME, EVEN UNDER EXTREME PRESSURES AND TIGHT WORKING SCHEDULE AND ENSURE TOP QUALITY WORKS. WE ARE WELL PRAISED BY THE GOVERNMENT AND PEOPLE WITHIN THE TRADE. COMPLETED PROJECT SUCH AS LAMMA POWER STATION EXTENSION¡ªWITH SOME 105,000M2 OF RECLAMATION AREAS, ABOUT 60M FROM THE SOUTH COAST OF LAMMA ISLAND, WITH CONSTRUCTION OF WAVE WALLS / SEAWALLS, DRAINAGE AND OTHER INFRASTRUCTURE ETC., COMTRACT SUM TOTALS HKD 460 MILLION, CONTRACT PERIOD OF 24 MONTHS, COMPLETED SOME 4 MILLION M3 OF DREDGING WORKS, 150,000 M3 OF COAL ASH RECLAMATION, 100,000M2 OF GEOTEXTILE INSTALLATION, 1200M LONG VERTICAL R.C.SEAWALLS, 17 NOS OF LARGE PRECAST BOX CULVERTS, WITH THE HEAVIEST UNIT BEING 8500T, 7.7 MILLION M3 OF RELCAMATION WORKS, AND 1100 M LONG OF SLOPING ROCK AMOUR SEAWALLS. EASTERN AND WESTERN TEMPORARY JETTIES FOR STONECUTTERS BRIDGE, CONTRACT SUM OF HKD 19.85 MILLION. SHENZHEN TO TAI PO TWIN SUBMARINE GAS PIPELINES, SOME 50T OF ROCKFILL DUMPING AND TRENCH WORKS. |